Phase II Project List

Phase II Status: Under Construction

Comsewogue High School

  • Renovation of Faculty Bathrooms and Nurse's Bathrooms to Meet ADA Compliance 

  • Replace Cafeteria Windows, Storefront and Tech Room Windows

  • Replace Waterless Urinals and Sinks

  • Add Remaining RUT and HVAC Units to BMS

  • Install Batting Cage for Upper Gym

  • Expansion of Project Adventure Elements 

JFK Middle School

  • Renovate Faculty Bathrooms to Meet ADA Compliance

  • Reconnect leaders to pools at recess area

  • Add Electrical Circuits for Air Conditioning 

  • Replace Auditorium Seating 

  • Replace Carpet in Auditorium

  • Provide a Permanent Sound System in Auditorium

  • Repair CMU

  • Replace Hallway Ceilings

  • Provide infill at Railing in Boiler Room 

Boyle Road Elementary School

  • Renovate Faculty Bathrooms to Meet ADA Compliance

  • Provide additional Exterior Lighting

  • Replace all Waterless Urinals and Sinks

  • Repair and Replace Drainage in 1 Boys Bathroom

  • Regrade back pitch at South and Southwest

  • Provide infill mesh at Boiler Room Railing

  • Add Circuits to Cafeteria, Kitchen and Gym Area

  • Replace 3 Exterior Light Poles

  • Replace Railings and Tread Nosings at Loading Dock Stairs

  • Repair Crack at Retaining Wall

  • Add 2 Pole-Mounted Light s and Structures in South Parking Lot 

Terryville Road Elementary School

  • Renovate Faculty Bathrooms to Meet ADA Compliance

  • Add Circuits for Air Conditioning Units

  • Brickwork

  • Tuck-point Chimney

  • Roof Replacement

  • Add Boiler Room to Generator

  • Add Drainage at Rear Drive

  • Add Spare Electrical Panels

  • Replacement of PA/Intercom System

  • Replace Waterless Urinals and Sinks 

Clinton Avenue Elementary School

  • Renovate Faculty Bathrooms to Meet ADA Compliance

  • Repair and Replace Asphalt / Mill Top Course of Asphalt

  • Repair and Add Exterior Lighting in Rear of Building

  • Replace Waterless Urinals and Sinks

  • Replace Sidewalks

  • Provide infill mesh at Boiler Room Railing

  • Replace Student Wardrobes / Storage Units 

Norwood Avenue Elementary School

  • Replace Elevator Controls and Hydraulics

  • Renovate Faculty Bathrooms to Meet ADA Compliance

  • Repairs to Parking Lot

  • Replace Asphalt at District Office Parking Lot

  • Add Additional Parking for Pre-K Program

  • Replace Sidewalks

  • Install additional Electrical Outlets in Classrooms

  • Repair Roof Drain 

  • Replace Waterless Urinals and Sinks

  • Repair Loading Dock

  • Replace Student Wardrobes / Storage Units